Welcome
Introduction
THE ARM
The Bikes
Modifications
Contact

Twentythree2

Welcome
Introduction
THE ARM
The Bikes
Modifications
Contact
Arm prototype and assembly test
24 April 2019
Shane Kapitzke
Arm prototype and assembly test
Shane Kapitzke
24 April 2019

Arm prototype and assembly test

Shane Kapitzke
24 April 2019

Test print of the parts forming the lower arm assembly, with DnM shock installed.
In this test the forearm tube was still at its 1200mm length, but provided somer indication of how the shock performs - At zero PSI in the compression chamber I can use my body weight to actuate the elbow with some effort.
Time to revalve the shock…

Video of the test parts in action.

IMG_20190425_095605_resized_20190425_101304434.jpg
IMG_20190425_100719_resized_20190425_101304144.jpg
Newer PostHand and trial fit/test
Older PostNew arm, new hand and new bike
Back to Top
SWM Gran Milano 440
Royal Enfield GT650
TRX 850 No.1
TRX 850 No.2
Z900
Main Gig - Side Gig
shane@twentythree2.com